below menu

Case Study - Castleford High School

 

Castleford High School were very happy with the solution of a simple C2 frame around the perimeter but to meet their criteria of a central IT pod with fixed electrics they could not source the legally compliant frame.

 

They wanted a symmetrical top with fixed frame and electrics coming up a central porthole.


Flexit B1 frame without an upstand was the solution that not only met their needs but undercut all the prices for it’s simple, heavy duty and easily installed design.

 

The tops they chose were Plexiform 40 worksurface postformed front and back edge, an off-the-shelf breakfast bar worktop that is hard to beat.

 

 



below menu


Cloakroom & Changing Room Benching

Cloakroom & changing room

IT/Worksurface Benching

Worksurface framing solutions